Linemen install new power infrastructure in downtown Victoria. (Tom Fletcher/Black Press)

B.C. Hydro’s $5.5 billion in deferred debt puts pressure on rates

Auditor General says 29 accounts a complicated system

B.C. Hydro customers will have to pay off $5.5 billion in operating debt that has been pushed into the future to keep rates from spiking, and it’s not yet clear how the NDP government is going to tackle that.

Energy Minister Michelle Mungall’s initial effort to freeze rates was blocked by regulators, requiring a 3.5 per cent increase in 2017. Last year’s increase was another three per cent, similar to what the B.C. Liberal government had scheduled in its 10-year rate plan.

RELATED: B.C. Hydro freeze refused, rates go up 3% for 2018

RELATED: NDP looks for ways to rein in B.C. Hydro rates

In June of 2018, Mungall announced separate reviews of Hydro’s capital and operating debt, with outside experts to find a way forward, after the NDP government reluctantly decided to complete the $10 billion Site C project.

A key goal for Mungall is to return rate-setting to the B.C. Utilities Commission, after a series of directives from the previous government that drew accusations of political interference to make B.C. Hydro’s financial picture look better than it is.

On Wednesday, B.C. Auditor General Carol Bellringer released the latest report on B.C. Hydro’s deferred operating debt, which is separate from the billions in capital debt racked up for project such as Site C on the Peace River, the John Hart Dam reconstruction on Vancouver Island and the Ruskin dam and powerhouse rebuild in the Fraser Valley.

Deferring the bills of major storms and other unexpected spikes in operating costs is normal practice for utilities, Bellringer says. But B.C. Hydro’s network of 29 accounts is unusually complicated, with “rate smoothing” effects on future rates unclear.

In their response to Bellringer’s report, the ministry and B.C. Hydro emphasize that current customer rates are already on track to pay off 25 of the 29 deferral accounts.

Three that are not are the “customer crisis fund” account, the “Site C regulatory account” and the “rate smoothing regulatory account.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Salmon Arm pharmacies continue to experience flu vaccine shortage

One pharmacy has privately sourced vaccine in stock, available for purchase

Chances Gaming Centre evacuated due to ‘security issue’

Patrons were evacuated at approximately 8:45 p.m.

Best in business: North-Okanagan Shuswap companies named top 10 semi-finalists

Small businesses from Salmon Arm, Vernon, Kelowna compete for top spot

White Lake firefighters go beyond call of duty with construction project

Storage shed built for sports equipment in South Shuswap park

Opening date for popular North Shuswap outdoor ice rink delayed

Warmer temperatures have pushed back the openings of several rinks in the region

VIDEO: Success of wildlife corridors in Banff National Park has advocates wanting more

Demand for more highway protection escalated after seven elk were killed by a semi-trailer near Canmore

Column: Kid’s growing up fast on Old Town Road

In Plain View by Lachlan Labere

Sharks beat Canucks 4-2 to snap 6-game skid

Vancouver visits Vegas on Sunday

Fans sing Canadian anthem after sound system breaks at BMW IBSF World Cup

The Canadians in attendance made sure their team and flag were honoured on the podium

Frosty will have to pay rent to stay on Okanagan sidewalk next Christmas

Vernon Teach and Learn allowed to keep Frosty up, but will need a permit come January 1

Prince George RCMP use bait packages to catch porch pirates over the holidays

First-in-Canada program with Amazon looks to combat parcel theft

WATCH: Fire destroys Big White Ski Resort chalet

Social media eulogies peg the property, nicknamed “The Pharamacy,” as both loved and hated

Conservation officers on the hunt for North Okanagan moose poachers

Officers execute search warrant Friday morning, investigation continues

UPDATE: Highway 1 reopens after vehicle incident near Boston Bar

Initial reports of a jack-knifed semi truck had closed both directions of the highway

Most Read