CSRD moving ahead on new $6.4 million building

Site preparation will soon begin on a new office building for the Columbia Shuswap Regional District.

Site preparation will soon begin on a new office building for the Columbia Shuswap Regional District.

After several years of discussion, a contract between the regional district and MMH Developments Ltd. of Salmon Arm was approved by the board of directors at an in-camera session of last week’s board meeting.

The (net) $6.4 million project includes a land swap in which MMH will take over the Marine Drive property currently owned by the regional district as part payment and construct a new building at 561 Harbourfront Dr. east of Marine Park.

“Effectively we were looking for a turnkey project –- someone who would provide land, design and build the facility and take as partial payment against that, ownership of our offices,” says CSRD chief administrative officer Charles Hamilton.  “And we wanted a fixed price on that.”

Hamilton says the regional district still reserves the right to sell the two office buildings within a specified period of time if they can get a better price than is guaranteed within the deal with MMH.

CSRD embarked  on a process in 2008 to identify office space, having determined the regional district would require new office space in the range of up to 25,000 square feet within a five-year period.

Over the last number of years, CSRD has considered various development concepts, most recently issuing a request for proposals to the private sectors to undertake the design and build project from March 13 to April 26 of this year.

“We initiated the formal process, received three proposals and we accepted the preferred proponent,” said Hamilton Friday, noting. “Over the last several months, we have been negotiating a master agreement that sets out all the business terms. It was taken to the board yesterday and the board ratified the agreement.”

Hamilton says the MMH bid was the lowest of three local bids being considered.

MMH Developments is local architect Bernd Hermanski, builder Ian McDiarmid and Ross McDonald, a Vancouver businessman who has been involved in Salmon Arm projects previously.

“A comprehensive information package will be released explaining why we went this way,” said Hamilton. “The highest consideration in the planning of this was to keep it as cost effective as possible. That was the over-arching consideration when it came to the evaluation of the various proposals.”

Site preparation could begin as early as this week, with construction beginning some time in the spring.

The 22,000 sq. ft., two-storey building with elevator will accommodate future expansion. It will be built with regionally sourced commercial grade wood and will be a glue-laminated, heavy timber frame structure on a concrete foundation. The exterior will be a combination of stucco and metal cladding.

The HVAC system is a water source heat pump with a geothermal exchange system.

“Notwithstanding anytime a local government elects to build a new facility it’s always potentially controversial,” he says. “The board recognizes that and I have instructions to develop an information circular that will be on the website and circulated explaining all the relevant factors.

 

Hamilton expects that information will be made available by mid-December.

 

 

Just Posted

Celista woman asks that people stop swiping daffodils from memorial bed

Cynthia Bentley honours memory of those lost to cancer by planting 100 daffodils each year

New bargaining dates set for Interior mill workers, owners

Northern agreement expected to set a precedent for local workers during May negotiations

Counsellors: Grief can come in many forms after Salmon Arm shooting

Community members urged to stay connected with others following trauma

Transportation ministry promises paving near Salmon Arm, Sicamous

Salmon Valley Road, Yankee Flats Road and Highway 1 near Sicamous on the resurfacing list

VIDEO: Driver in bizarre hit-and-run at B.C. car dealership turns herself in

Police believe alcohol was a factor in incident causing estimated $15,000 in damages

Arrest made in off-road Okanagan park detour

RCMP air services helps track down 36-year-old suspect

Petition urges limits on retail cannabis stores in Summerland

Ban on downtown stores, increased regulations in other areas proposed

Canfor temporarily shutting down lumber mills across B.C.

Low lumber prices and the high cost of fibre are the cause of curtailment, according to the company

Okanagan physician and family reflect passion for medicine with hospital gift

Dr. Paul Cobbin and family donate to the South Okanagan Similkameen Medical Foundation’s campaign

Two in critical condition, several still in hospital after Langley deck collapse

Close relative Satwant Garcha makes daily trips to visit those injured at the wedding

Kelowna man speaks up for limb loss awareness after losing leg

Ralph Zaiser is getting used to life as a recent amputee

Most Read