CSRD moving ahead on new $6.4 million building

Site preparation will soon begin on a new office building for the Columbia Shuswap Regional District.

Site preparation will soon begin on a new office building for the Columbia Shuswap Regional District.

After several years of discussion, a contract between the regional district and MMH Developments Ltd. of Salmon Arm was approved by the board of directors at an in-camera session of last week’s board meeting.

The (net) $6.4 million project includes a land swap in which MMH will take over the Marine Drive property currently owned by the regional district as part payment and construct a new building at 561 Harbourfront Dr. east of Marine Park.

“Effectively we were looking for a turnkey project –- someone who would provide land, design and build the facility and take as partial payment against that, ownership of our offices,” says CSRD chief administrative officer Charles Hamilton.  “And we wanted a fixed price on that.”

Hamilton says the regional district still reserves the right to sell the two office buildings within a specified period of time if they can get a better price than is guaranteed within the deal with MMH.

CSRD embarked  on a process in 2008 to identify office space, having determined the regional district would require new office space in the range of up to 25,000 square feet within a five-year period.

Over the last number of years, CSRD has considered various development concepts, most recently issuing a request for proposals to the private sectors to undertake the design and build project from March 13 to April 26 of this year.

“We initiated the formal process, received three proposals and we accepted the preferred proponent,” said Hamilton Friday, noting. “Over the last several months, we have been negotiating a master agreement that sets out all the business terms. It was taken to the board yesterday and the board ratified the agreement.”

Hamilton says the MMH bid was the lowest of three local bids being considered.

MMH Developments is local architect Bernd Hermanski, builder Ian McDiarmid and Ross McDonald, a Vancouver businessman who has been involved in Salmon Arm projects previously.

“A comprehensive information package will be released explaining why we went this way,” said Hamilton. “The highest consideration in the planning of this was to keep it as cost effective as possible. That was the over-arching consideration when it came to the evaluation of the various proposals.”

Site preparation could begin as early as this week, with construction beginning some time in the spring.

The 22,000 sq. ft., two-storey building with elevator will accommodate future expansion. It will be built with regionally sourced commercial grade wood and will be a glue-laminated, heavy timber frame structure on a concrete foundation. The exterior will be a combination of stucco and metal cladding.

The HVAC system is a water source heat pump with a geothermal exchange system.

“Notwithstanding anytime a local government elects to build a new facility it’s always potentially controversial,” he says. “The board recognizes that and I have instructions to develop an information circular that will be on the website and circulated explaining all the relevant factors.

 

Hamilton expects that information will be made available by mid-December.

 

 

Just Posted

In Photos: Crowd thrilled at S-Games in Sicamous

The celebration of two-wheeled transportation showed off daring athletes on all kinds of bikes.

Mix of sun and cloud for the Okanagan-Similkameen Shuswap

Chance of showers for much of the region this afternoon

Water quality makes swimming unsafe at three beaches near Salmon Arm

The Adams Lake Indian Band has issued a water quality notice affecting beaches at three campgrounds.

Okanagan Air Cadet challenges cadet program on gendered policy

He wants the policy to be more gender inclusive

Okanagan-Shuswap Weather: Summer sun for Sunday

The forecast for the week ahead shows some rain but plenty of sun and warm tempertures.

VIDEO: Bystander training gains traction as tool to prevent sexual harassment, violence

Julia Gartley was sexually assaulted after an event, and no one stepped in to help

North Okanagan residents warned of road closure

Cherryville bridge closures planned

Update: Coroner investigating after body recovered from Okanagan Lake

Penticton fire department assisted the RCMP with the recovery of a body Saturday

Two brands of ice cream sandwiches recalled due to presence of metal

The Canadian Food Inspection Agency issued a recall on Iceberg and Originale Augustin brands

Sexual assaults, extortion on the rise even as crime rates stay low: Stats Canada

Rates of police-reported sexual assault rose for the fourth year in a row

CDART trains North Okanagan volunteers

Regional group looking to form to help animals in cases of emergencies and disasters

Vancouver Island teens missing after vehicle found ablaze near Dease Lake, BC

RCMP say a body discovered nearby not one of the missing teens

A year later, ceremony commemorates victims of the Danforth shooting

It’s the one-year anniversary of when a man opened fire along the bustling street before shooting and killing himself

Most Read